The township has over 70,000 metres of road, more than 30,000 metres of trenches and an irrigation capacity of 490 kilowatts.
With the first transition, powers of several kilowatts are detected.
The cost of electricity was estimated using an engineering model based on the number of kilowatts needed and the functioning hours of the equipment involved in treatment (33).
Fishing effort expressed in "kilowatt days" is the product of the power of the vessel in kilowatts and its time at sea expressed in days.
It is provisionally estimated that some 300,000 kilowatts of power were lost.
Gas production in continuous vertical retorts costs in capital £48 per kilowatt equivalent and in oil reforming plants £8.
To-day, the cost per kilowatt installed is over £50.
We know that the cost of a new station may be perhaps £15 per kilowatt installed, or, say, for a large station of 100,000 kilowatts, £1,500,000.